| 6.1 |
MOBILE SHORE CRANE (70 Mton) |
|
|
| |
Mobilization / Demobilization |
|
OMR 100 / OCCASION |
| |
Shore Crane rental |
|
OMR 100 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| |
2x mobile shore cranes available |
|
|
| 6.2 |
REACH STACKER |
|
|
| |
Mobilization / Demobilization |
|
OMR 50 / OCCASION |
| |
Reach Stacker rental |
|
OMR 100 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| 6.3 |
HEAVY DUTY FORKLIFT |
|
|
| |
HL Forklift |
|
OMR 80 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| 6.4 |
16T FORKLIFT |
|
OMR 32.500 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| 6.5 |
LOW DUTY FORKLIFT |
|
OMR 22.500 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| 6.6 |
BOB CAT |
|
OMR 22.500 / HOUR |
| |
(minimum usage one (1) hour, charges are non-dividable per hour) |
|
|
| 6.7 |
EQUIPMENT CHARGES (inside ships' holds) |
|
|
| |
Equipments used inside vessels for discharging / loading, cleaning and/or any other operations will be charged for as per tariff as brought forward from item 6.3 to 6.6. The Terminal Operating Company does not require a written approval from relevant party (e.g.: shipping agent) for usage of equipment inside ships' hold prior lifting same equipment inside ships' hold(s). Usage of equipment inside holds will be noted and brought forward in final discharge and/or loading report(s). |
|
|
| |
Whenever a shore crane is required to lift equipment in to and subsequently out from a ships' hold, a service charge will be applicable of OMR 225 for the operation. |
|
|
| 6.8 |
TERMINAL TACKLE |
|
|
| |
Terminal tackle meaning all required equipments outside of the ones mentioned above to carry out stevedoring and/or yard operations at C. Steinweg Oman Terminal LLC |
|
|
| |
All charges here below are per day (24. hrs. or part thereof) unless otherwise mentioned |
|
|
| 6.8.1 |
SHACKLES (per piece) |
|
|
| |
Up to 10 MT |
|
OMR 1.350 |
| |
Between 10 MT and 25 MT |
|
OMR 3.400 |
| |
Over 25 MT |
|
OMR 6.500 |
| 6.8.2 |
SPREADER BARS |
|
|
| |
Up to 15 MT |
|
OMR 11.500 |
| |
Between 15 MT and 30 MT |
|
OMR 17.500 |
| |
Over 30 MT |
|
OMR 24.500 |
| |
20" container spreader |
|
OMR 35.000 |
| |
40" container spreader |
|
OMR 40.000 |
| |
110 MT Spreader |
|
OMR 42.500 |
| |
Big bag Jug (12 BB CAP.) |
|
OMR 40.000 |
| 6.8.3 |
HOOKS (per set) |
|
|
| |
Pipe hooks |
|
OMR 9.000 |
| |
Plate Hooks ( Incl. chain) |
|
OMR 12.000 |
| |
Container Hooks |
|
OMR 9.000 |
| |
Safety Hooks |
|
OMR 9.000 |
| 6.8.4 |
STEEL WIRE SLINGS ( per set) |
|
|
| |
Up to 12.5 MT |
|
OMR 12.000 |
| |
Between 12.5 MT and 25 MT |
|
OMR 17.500 |
| |
Over 25 MT |
|
OMR 24.500 |
| 6.8.5 |
CHAINS (per set) |
|
|
| |
Up to 15 MT |
|
RO 17.500 |
| |
Over 15 MT |
|
OMR 24.500 |
| 6.8.6 |
NYLON SLINGS (per set) |
|
|
| |
Up to 3 MT |
|
OMR 6.000 |
| |
Between 3 MT and 10 MT |
|
OMR 9.750 |
| |
Over 10 MT |
|
OMR 17.500 |
| 6.8.7 |
GRAB (8-10 CBM) |
|
|
| |
Per Shift ( or part thereof) |
|
RO 85.000 |
| 6.9 |
ADMINISTRATION CHARGES |
|
|
| 6.9.1 |
Cargo Charges & Removal Order (CCRO) |
|
RO 10.000/document |
| |
All cargo will be delivered only on presentation of relevant CCRO. CCRO's are issued by the Terminal Operationg Company (Tally Department) upon submission of Agents Delivery Order and Customs Declaration (Customs Clearance). Delivery Order and Customs Declaration require to include relevant copies of the Bills of Lading and packing list(s). |
|
|
| |
CCRO documents are issued separately per Bill of Lading |
|
|
| 6.9.2 |
Terminal Entry Pass ( personnel) |
|
|
| |
Day Pass |
|
FREE |
| |
3 Month pass |
|
OMR 5.000 |
| |
6 Month pass |
|
OMR 8.500 |
| 6.9.3 |
Terminal Entry Pass (for incoming cargo receiving trucks) |
|
OMR 2.000 / entry pass |
| |
per entry pass issued |
|
|
| |
All terminal entry passes will be billed to the relevant party which is assigned to the shore handling charges. Passes to be issued after office opening hours can be charged for additional overtime and labor expenses at the terminal operator discretion. |
|
|
| 6.10 |
GARBAGE COLLECTION AND GARBAGE SKIPS |
|
OMR 50.000 / SKIP |
| |
1. Garbage skips will be made available to all vessels berthing alongside the CSO terminal. |
|
|
| |
2.Skips may be used for general household garbage and for removed lashing material and dunnage. |
|
|
| |
3.It is strictly prohibited to use the garbage skips for the disposal of Hazardous Substances (cfr. IMDG regulations). A separate authorization has to be obtained for the removal of such substances. |
|
|
| |
4.Minimum one garbage skip will be provided for each vessel berthing alongside the CSO Terminal. |
|
|
| |
5. Rental charges for the provided skip(s) incl cost to remove the environmental harmless and not as dangerous good classified garbage will be debited at OMR 50 per skip and will be debited to the agent of the vessel. |
|
|
| 6.11 |
SUPPLY OF WATER, BUNKERING (FOODSTUFF) AND/OR FUEL TRUCKS TO VESSELS |
|
OMR 50.000 / SKIP |
| |
For all parties wanting to bring in water, bunkering (food) and/or fuel trucks to vessels, please note relevant charges per truck. All charges will be invoiced to relevant party and therefore no cash payments will be accepted; |
|
|
| |
Water truck |
|
OMR 22.500 / TRUCK |
| |
Bunkering (food & other supplies) |
|
OMR 22.500 / TRUCK |
| |
Fuel |
|
OMR 65.000 / TRUCK |
| |
Bunkering (food & other supplies): |
|
|
| 6.12 |
WEIGHBRIDGE CHARGES |
|
|
| |
In case trucks require to be weighed at CSO weighbridge, the following charges will apply: |
|
OMR 15.000 / TRUCK |
| |
The weighbridge charges include 2x separate weighing (1x empty or full weighing and subsequently 1x full or empty weighing) incl. delivery of weight receipt to the truck driver. |
|
|
| |
weighbridge is calibrated to 100 Mton |
|
|